| Planning of measurement and control systems
Philip Morris Berlin GmbH –Construction of a new
production facility
Planning and tendering of the complete measurement and
control systems
for reconstruction of different production halls in the field of
Facility
Management of the company Philip Morris. In detail this have been
the air
conditioning system of the production halls, refrigerating machines,
pneumatically driven compressors and the boiler station for the
central
steam supply.
Public Services Karlsruhe GmbH – Construction of
a new 40 MW
hot water boiler station
Planning of NSHV, USV stations for 24 VDC and 400 V AC, routeing
distributor
with all sub-distributors. Preparation of the control functions
of both double-
material burners in a safety oriented control system. Preparation
of the
function for the main process control systems of the power station.
Systems for technical power stations
Siemens Redwitz
For the Rusel power station Deggendorf a hot water station (175°C
with
12 MW) has been constructed at three diesel engines via an exhaust
gas
heat exchanger to enable the supply of a district heating system.
The main tasks were programming of the control and regulation functions
as well as management for optimal heat extraction to the district
heating
system. Application of a programmable logical controller (PLC) Simatic
S7-416 as main control with management of three Simatic S7-414 for
controlling of the exhaust gas heat exchanger.
HKW Radebeul, Wooden boiler
Control and regulation of high pressure and low pressure steam reduction
stations in connection with a steam turbine.
Operating parameter HP-reduction station: P-Pressure 22 –
26 bar
FD temperature: 400°C
LP pressure: 1.9 – 2.4 bar
LP temperature: 240 – 310°C
Planning and projecting of the measurement system.
Programming and start-up of control and regulation functions for
the
reduction stations in connection with a steam turbine.
HKW chemical plant Bad Köstritz
Strengthening of a heavy oil lighted steam boiler station for supply
of the
chemical plant Bad Köstritz.
Two steam boiler each 15 t/h / 21 bar, two steam reduction stations,
heavy
oil supply storage with pump groups and up-heating.
Planning of the msr-technical system, programming and start-up of
the
entire system.
Application of ABB-SPSen as automation systems, the control system
is ZenOn (Copa Data).
HKW Hermsdorf
Planning of the msr-technical system, programming and start-up of
the
entire system.
The complete technical automation is controlled via Siemens S7-technique
(S7-300 to 400).
Connection to the network of the control station Jena via telecontrol
with
journal 60850-5-101.
Coupling of static SIPART-controllers DR 21/22 via Profibus-DP.
Operation and monitoring of the entire system via remote control
as well
as a central control system realized via WinCC.
Fagerdala Deutschland GmbH Ohrdruf
To guarantee the steam supply of the plastic manufacturer Fagerdala
World
Foams there has been installed a second steam boiler (10 bar, 12
t/h).
Planning of the msr-technical system, programming and start-up of
the
entire system.
Control and regulation of the new steam boiler via technical automation,
management of the entire station. Application of Siemens
automation technique.
Systems for water and wastewater technology
Wastewater treatment plant Leisslinger Mineralbrunnen
Control and regulation (Simatic S7-300) of the complete wastewater
treatment plant.
Process control system WinCC and ACRON with remote control.
Wastewater pre-treatemnt plant Frenzel Oderland Tiefkühlkost
GmbH Manschnow
Entire switchgear with automation system Simatic S7-300, niveau
measurements
Operation and monitoring systems with Siemens OP 170B
|